Loch Goin Spillway Bridge

Direct Engineering (Scotland) Ltd recently completed the fabrication and installation of an access bridge over the Loch Goin spillway.  The bridge was 10m length with a 3.3M span and although it was primarily for pedestrian use, required a load capacity of 20T. This was to allow access for an excavator during emergencies. The structure was fabricated from S355 mild steel with a galvanised finish.
Direct Engineering is approved to CE Mark structures up to Execution class 3, should you have any enquiries regarding an installation then please contact [email protected]

 

    


 

 

 