As part of the WellPark Brewery site improvement project Tennents commissioned Direct Engineering to Fabricate and install a large Retro style T.V to the gable end of the building. The result was a magnificent 1,353 ft2 installation complete with tuning dials, on/off switch, aerials, authentic 70’s wallpaper and, of course a few cans of Tennent’s finest lager perched on top of the telly! This was a huge undertaking, which was only made possible by working closely with Tennents, Reflex Blue, Smug, Clancy Consulting, Prosigns, ETI and Inurfacemedia.
The project consisted of fabricating the massive frame for the T.V and the beer cans to sit on the on top. Due to the size of the frame it was fabricated in two sections to then be assembled and installed on site along with the 5M x 4M digital video wall provided by SBC.
|